Portfolio

We are proud to partner with visionary clients investing in a greener future.

Below are a few current projects.

Our goal is always to build a mutually beneficial long term relationship with our
clients by earning and maintaining their confidence

 

IKEA Brossard distribution Center

150 Ton geothermal system, displacement ventilation, intelligent lighting and more!
Savings of 43% have been measured to date and over 600 tons of harmful CO2 emissions will be removed from the atmosphere
annually!

Alexander Galt High School, etsb

Hybrid boiler plant, Full DDC conversion
Energy recovery units on welding shop
and central administration cafeteria block
Variable speed kitchen hood
Variable speed pumps and fans
Ultra efficient lighting
Architectural upgrades

4200, St Laurent, Montreal

free cooling design for multiple stand-alone units
Development and implementation of a 96% heat recovery system
64% savings in natural gas and 23%
electricity savings
Reduction of 690 tons CO2 emissions/yr

St Maarten Luxury Villas

Solar cooling system
Water harvesting
Closed-grid Photovoltaic panels electrical power sharing
LED lighting and intelligent controls
UPS power ride-through with generator backup

IKEA Montreal Store

Solar cooling system

ETSB Board Office

rain water harvesting, geothermal, displacement ventilation, solar panels that act as sunshades, intelligent lighting, high air quality ventilation system

Other projects

The Ecovision team has many leading edge projects to its credit, including composite boiler plants at Multina and Centre Hospitalier Régional de Trois-Rivičres, tied into a recuperative chiller plant at Holt Renfrew (Montré
al), innovative energy control strategies coupled to mechanical upgrades for Eastern Townships School Board (Magog). Our members have been involved with geothermal projects (open & closed loop) for 15 years. We also do traditional engineering and value analysis as for Hydro-Québec Gentilly II nuclear power plant laboratories.